Product description
Hollywood Epoxy Paint Technical Data Sheet Product Description: Hollywood Epoxy Paint based on high quality epoxy polyamide resin. This coating has excellent adhesion and outstanding resistance to acid, alkalis, petroleum solvents, sour crudes, hydrogen sulfide and salt water. Hollywood Epoxy Paint is a time tested and proven. Used to protect chemical concrete, steel and other structural materials from non-oxidizing acids and alkalines for both interior and exterior applications. Recommended Usage: Hollywood Epoxy Paint is recommended for aisle ways, assembly plants, bakeries, basement floors, walls, block walls, bottling plants, break rooms, cafeterias, canning plants, car washes, cells, chemical processing area, chemical pump area, chemical storage area, corridors, entrances, filters, food plants, fork lift area, hospitals, kennels, kitchens, laboratories, laundries, leveling concrete, loading docks, locker rooms, machine shops, manufacturing area, marine surfaces, offices, patching concrete, photography processing area, power plants, printing plants, pools, ramps, restaurants, secondary chemical containment, semiconductor plants, sewer plants, shops, shopping centers, shower rooms, stores, show rooms, supermarkets, tanks, veterinary facilities, water plants, warehouse and many other where high standard of durability is expected. Technical Data Generic Type : Epoxy Polyamide Flash Point : 25°C (77°F) Volume Solids : 54 Specific Gravity : Base 1.19 kg/liter – Hardener 0.96 kg/liter Gloss level : Available in Glossy, Semi Glossy and Matt finish. Dry Film Thickness : 40 micron/coat Wet Film Thickness : 70 micron/coat Theoretical Coverage : 140 to 150 sq.fit/Ltr/coat(40 micron)** Recoating Period : 6 to 8 Hrs Approximate Drying Time @ 20°C/68°F : Surface dry: 1 hrs, Hard dry: 5 hrs, Full Cure: 7 days Mixing Ratio : Part A 3 : Part B 1 by volume (Base : Hardener) Recommended Thinner : Hollywood Epoxy Thinner Thinning Ratio : Airless Spray (5%), Air Spray (15%), Brush (5%) Pot Life : 6 to 8 Hrs Shelf Life : 1 year from date of manufacture original tightly closed container away from direct sunlight and excessive heat. Mechanical stirring may be necessary before usage. Method of application : Airless spray, Air Spray or Brush ** Actual covering capacity may vary depending upon the surface condition, temperature, wind velocity, application skill, surface roughness, surface porosity and shade to shade. Surface Preparation: Remove oil and grease etc. thoroughly with suitable detergent. Remove salts and other contaminants by high pressure fresh water cleaning. Clean damaged areas thoroughly by power tool cleaning or by abrasive blasting. Improved surface preparation will improve the performance of the product. Use appropriate Hollywood Epoxy Primer for better performance. Mixing Instructions: Temperature of Hollywood Full Gloss Epoxy Paint must be 20°C/68°F or above at the time of mixing. Stir each component separately before blending. Mix three parts by volume of Part A with one part by volume of Part B for three minutes with a low speed electric drill motor equipped with a mixing paddle. Application Conditions: Use only where application and curing can proceed at temperature above 10°C/50°F. Maximum relative humidity: 80%, preferably 40-60%. The temperature of the surface and that of the paint itself must also be above this limit. The optimal paint temperature for proper mixing, pumping and spraying is 15-25°C/59-77°F. In confined spaces provide adequate ventilation during application and drying. Application Process: *Airless Spray: Graco 45:1 or 56:1 or equivalent. Tip Size: 0.021-0.025”. Thinning: 5% by volume with Hollywood Epoxy Thinner.* *Air Spray: Air cap with E tip and needle. Moisture trap should be used between air supply and pressure pot. Thinning: 10-15% by volume with Hollywood Epoxy Thinner.* *Brush or Roller: Low nap rollers. Thinning: 5% by volume with Hollywood Epoxy Thinner.* *Amount of thinning affected by temperature conditions. Occurrence of standing water or droplets on the painted surface immediately after application may result in discolouration. Re-Coat Interval: 10°C (50°F) Minimum: 30 Hours - Maximum: 28 Days 20°C (68°F) Minimum: 10 Hours - Maximum: 21 Days 25°C (77°F) Minimum: 8 Hours - Maximum: 17 Days 30°C (86°F) Minimum: 5 Hours - Maximum: 14 Days Overcoating intervals related to later conditions of exposure: If the maximum overcoating interval is exceeded, roughening of the surface is necessary to ensure intercoat adhesion. All dust from sanding of blast roughening must be removed from the surface prior to the re-coat application. Avoid extra thinning for better result. Safety Feature: Take precautions to avoid skin and eye contact. Prolonged or repeated exposure may cause eye and skin irritation. If contact occurs, wash immediately and seek medical help. Use safety glasses with side shields and wear protective rubber gloves, face masks etc. Proper ventilation and protective measures must be provided during applications and drying period to keep solvent vapor concentrations within safe limit. All work involving the application and use of this product should be performed in compliance with all relevant local and national, Health, Safety & Environmental standers and regulations. Precautions: * Away from the source of ignition and fire. * Keep away from direct sunlight, heat and children. * Store in well ventilated location. * Stir well before use. * The container must be tightly closed when not in use. Pack Size: 1ltr, 4ltr and 20ltr. Shade Range: As per requirement.
Pricing Details
Price
Rs.1.00
MoQ
4 Litre
Tax
N/A
Delivery
N/A
Shipping cost
N/A
Stock
As per actuals
Delivery to
N/A
Product Specifications
Brand
N/A
Model number
N/A
Type
N/A
Size
N/A
Color
N/A
Warranty
N/A
Features
N/A
Attributes
N/A
You might be interested in
SAZ ACRYLIC EMULSION
ZINAK SYNTHETIC ENAMEL
SYNTHETIC PRIMER SURFACER - GREY
EPOXY RED OXIDE PRIMER
EPOXY PRIMER GREY
EPOXY ZINC PHOSPHATE PRIMER
AQM53 EPOXY ANTIFOULING PAINT
SYNTHETIC RED OXIDE PRIMER
What our customers say
There are no reviews for this product